Diamond Mining Process
Diamond mining process normally first uses vibration feeder to feeding material to trommel scrubber, After trommel scrubber for washing clean, and separator big size out, then to vibration screen. Vibration screen also for separator different size.
Why Choose Us?
Diamond Mining Process Case
Diamond Washing Plant Video
200 TPD Diamond Washing Equipment
No. | Equipment name | Unit | Qty | |||||
1 | Hopper | SET | 2 | |||||
2 | Vibrating feeder | SET | 2 | |||||
3 | Belt conveyor | SET | 1 | |||||
4 | Vibrating screen | SET | 1 | |||||
5 | Slurry pump | SET | 1 | |||||
6 | Hydrocyclone | SET | 1 | |||||
7 | Magnetic separator | SET | 1 | |||||
8 | gold smelting furnace | SET | 1 |
200 TPD Diamond Washing Plant
Process Explanation
First use vibration feeder to feeding material to trommel scrubber, After trommel scrubber for washing clean, and separator big size out, then to vibration screen. Vibration screen also for separator different size.
This process is for the Angola clay diamond separator line. The capacity is for 200 tons per hour, First use a backhoe to get material to the hopper, under hopper has a vibration feeder, vibration feeder can separator out +70mm size, then 0-70mm size to trommel scrubber, trommel scrubber is had two-part, one part scrubber is for washing, one part screen is for separator different size. After trommel scrubber then to vibration screen, separator size again then can use jig machine get diamond.
Trommel scrubber is good for clay mine washing, some mines have a lot of clay, if not washing first, the recovery rate is very lower. The trommel scrubber is fit for clay mine washing, it can’t recover the concentration, trommel scrubber is fit for all clay mine, like gold, diamond, tin, chrome, tantalum-niobium ores, and so on.
This 200 tons hours diamond separator line has to work for one year, and it has got good effect, for now, this customer want to open another 200 tons per hours line, our engineer have to go mine site for inspection, first can check the existing line, most things are good, but also some details can make more perfect, Our factory is a progress factory, we need to make the machine more and more perfect, besides checking the existing line, also need to check the new line, base the one new ore site, to choose the best machine.